Private timber dock and white boat beside calm blue-green water, with palm-lined waterfront homes across the river in Fort Lauderdale.

On Fort Lauderdale's New River, Check Which Side of the Rail Bridge a Dock Is On

On a weekday in January 2023, the Florida East Coast Railway bridge over the New River in downtown Fort Lauderdale broke down in the closed position and stayed down most of the day. The Sun Sentinel reported that boats could not get to anything west of downtown, and boats headed east were stuck behind the span. Marine businesses based upriver had boats waiting on the wrong side until the bridge came back up.

That day was unusual. The bridge's ordinary schedule is not. Every dock on the New River west of the FEC tracks shares a route to the ocean with a passenger and freight railroad. That makes the most important fact about a riverfront home's dock which side of one bridge it's on, and the plan for replacing that bridge was still undecided when the Sun Sentinel reported on it in mid-November.

Find the tracks before you find the house

The FEC crossing is a two-track bascule bridge built in 1978. Closed, it sits about 4 feet above the water, so almost nothing with a deck or a roof fits under it. The span stays open for boats and lowers for trains, inspections and maintenance.

The tracks also serve as a neighborhood boundary. The Sailboat Bend Civic Association describes its neighborhood as bounded by the FEC tracks on the east, Broward Boulevard on the north, and the New River on the south and west. Every Sailboat Bend dock is upriver of the rail bridge. So are the city's Cooley's Landing and New River/Downtown Docking facilities, which the city lists at 450 SW 7th Avenue. Safe Harbor Lauderdale Marine Center, a 65-acre yacht-repair yard with wet slips open to the public, is also upriver of the tracks.

Rio Vista sits on the other side of that line. The city maps it between the New River on the north, SE 12th Street on the south, U.S. 1 on the west and the Intracoastal Waterway on the east. A Rio Vista dock never passes the rail bridge. The same is true of the Las Olas side of the river toward the Intracoastal. Two homes a short drive apart can both be listed as New River waterfront and still have very different boating days, depending on which side of the tracks they're on.

The rail bridge runs on a train clock

The other bridges on the river are car bridges, which open for boat traffic. The FEC bridge is different because trains have the right of way. The City of Fort Lauderdale's New River Crossing page puts current traffic at about 60 trains a day and expects that to double once Broward Commuter Rail service is added.

Brightline and the Marine Industries Association of South Florida have pointed boaters to the Bridge Schedule app, which has real-time status and forecasts, and to a countdown clock at the bridge.

None of this rules out a spontaneous run to the sandbar from an upriver dock. It does mean checking the bridge app before casting off, and timing your return the same way. Outages also happen. Local 10 reported another breakdown on May 10, 2024. When the Sun Sentinel covered the 2023 failure, the president of the Marine Industries Association warned that repeated disruptions could send boat owners to other yards for repairs and launchings. That matters to a homeowner because the upriver yards are the closest service for an upriver dock.

Every bridge between the dock and Port Everglades

The rail bridge is the lowest crossing on the river, and every route to the inlet has others. NOAA's Coast Pilot, in its November 15, 2026 edition, lists these closed clearances for the bridges a Fort Lauderdale boater is most likely to meet.

Bridge Waterway Type Closed clearance
FEC Railway New River Bascule 4 feet
SE Third Avenue New River Bascule 16 feet
William H. Marshall Memorial New River Bascule 20 feet
South Andrews Avenue New River Bascule 21 feet
East Las Olas Boulevard Intracoastal Bascule 24 feet
SE 17th Street Intracoastal Twin bascule 55 feet authorized at center

A boat that clears 20 feet still needs openings at the downtown car bridges on the New River. The rail bridge stops almost everything regardless of height. From a dock east of the tracks, the river bridges drop away and the main question is the Intracoastal. The SE 17th Street bridge is the last crossing before the inlet. NOAA places it at Intracoastal mile 1065.9, with Port Everglades at mile 1066.3. The Las Olas bridge sits north of Rio Vista and is not on the usual run south to the port. NOAA reports the Sunrise Boulevard bridges, farther north, at a minimum of 25 feet.

When you compare two waterfront homes, count the bridges between each dock and the inlet, note the lowest clearance on each route, and check whether any of them opens on a railroad's schedule.

The bridge's future is still undecided

A buyer of an upriver home is also buying into a public decision that hasn't been made. Fort Lauderdale and Broward County have spent years arguing over how commuter rail should cross the New River, and the most recent reporting shows no resolution.

Broward County, which describes itself as the project sponsor, proposes replacing the current span with two bridges: a freight bridge about 5 feet above the water and a passenger bridge about 40 feet above it, keeping a 60-foot-wide navigation channel. The county's New River Crossing FAQ, updated in September 2026, puts that system at $470 million to $495 million in capital cost. An independent Jacobs review commissioned by the county estimated a tunnel at $1.5 billion. It found the city's own $888 million tunnel estimate incomplete.

The city favors the tunnel, saying it would keep the railroad out of the way of marine traffic and adjacent real estate. The City Commission reaffirmed the tunnel as its preferred alternative on February 3, 2026, and the mayor's letter followed on February 17. In May 2026 the city received a $650,000 federal Regional Infrastructure Accelerator grant for preliminary engineering, environmental review and geotechnical work.

The Sun Sentinel reported on November 14 that the Federal Transit Administration awarded $164 million in late October to Broward County Commuter Rail South, a project with $712 million in capital costs and service that could start in 2032. That line runs north from Aventura and ends near Broward Health Medical Center between 15th and 17th streets, south of the river, because the city and county still haven't agreed on a bridge or a tunnel.

For a household weighing an upriver home this winter, today's rail bridge is the one to plan around. The city estimates train traffic could double with commuter service, and either the county's bridges or the city's tunnel would change the river near that crossing. An owner today should expect a long public process before anything changes.

Questions a dock buyer can answer before an offer

How tall is your boat, and how tall might the next one be? Compare that height with the table above for every crossing on your route.

Is the dock east or west of the FEC tracks? The Sailboat Bend boundary is the easiest reference point on the north bank, and Rio Vista's city-mapped limits settle it on the south bank.

Where would the boat go for service? Upriver yards such as Lauderdale Marine Center are close to upriver docks, and the 2023 outage showed what happens to that trip when the rail bridge stays down.

Is the household comfortable checking a bridge schedule before every trip? Some boaters already plan around tides and weather, and the rail bridge adds one more check.

Quick answers

Do the downtown car bridges close for trains? No. The SE Third Avenue and South Andrews Avenue bridges are road bascules. The FEC Railway bridge is the only New River crossing listed here that closes for rail traffic.

Does a Rio Vista dock pass the rail bridge on the way to the inlet? No. Rio Vista sits east of U.S. 1 along the river and the Intracoastal, downstream of the tracks. Its usual route south to Port Everglades runs under the SE 17th Street bridge.

Has the replacement for the rail bridge been chosen? Not as of the November 14 Sun Sentinel report. The county is proposing two bridges, the city prefers a tunnel, and the newly funded commuter line stops south of the river.

If you're comparing docks along the Fort Lauderdale waterfront and want help mapping each home's route to the inlet before you make an offer, the team at Joe Caprio and Co. Real Estate can walk the river with you, bridge by bridge. Contact Us to set up a time.

Work With Us

Discover trusted real estate guidance backed by 30 years of experience. Let Joe Caprio and Co. help you find your next home or investment.

Follow Us on Instagram